Hi Friends,
Please clarify me the below query.
I created a material in ECC, tried to replicate it to CRM but the material could be replicated to CRM because of some issue, at this item the relevant queue got stuck in SMQ2 and got failed bdoc for it. I corrected issue in material master data in ECC, material is saved and the material got replicated to ECC, at this time the relevant queue processed successfully in SMQ2 as soon as the issue is fixed in ECC and I got green bdoc (processed), now I am having two bdocs for this material one is failed one and another one green one. Here my question, how I should go with failed bdoc, whether it should be reprocessed manually or ignore (keeping the failed status). Please clarify my above question.
Thanks and Regards,
Venkat